The AG Diesel Solutions IV6000 is an electronic performance module for 10.3L and 12.9L Iveco/FPT diesels in Tier III and Tier IV form, the engines found in farm, forestry, and construction equipment. Its wiring harness is designed for plug-and-play installation, so the module connects into the existing electrical system. The manufacturer positions the unit as a way to add horsepower and improve fuel efficiency over stock, without the cutting, splicing, or reprogramming that a custom tune typically involves.
Buyers searching for a 12.9L Iveco FPT Tier IV performance module, a 10.3L Tier III diesel power upgrade, or a plug-in Iveco tractor horsepower module should confirm their engine displacement and emissions tier before ordering, because fitment is limited to those engine families. The module is sold under the AG Diesel Solutions name, a PSI Power product line, so it is worth checking that name against the listing when comparing it with other Iveco/FPT modules. Its value rests on the plug-in design: a harness-based module is easier to fit and remove than a reflashed controller, which matters if you need to return an engine to stock.
The manufacturer lists the IV6000 for 10.3L and 12.9L Iveco/FPT engines in Tier III and Tier IV configurations. Sources differ on whether certain tractor models are excluded, so confirm your specific engine and machine with the manufacturer before ordering.
The manufacturer describes the module's wiring harness as designed for plug-and-play installation, meaning it is intended to connect into the existing system rather than requiring modifications to the engine wiring.
The manufacturer is AG Diesel Solutions, and the module is branded as a PSI Power product.
The IV6000 is designed as a plug-and-play install, so the work centers on connecting the module's harness to the engine's existing wiring rather than cutting into it. A manufacturer-branded installation video shows the module fitted to a Case IH 8230 combine, which is a useful reference for locating the mounting area and harness routing before you start. Confirm your engine displacement and tier first, then review the full installation instructions before disconnecting any battery leads.